THE ARDEA

THE ARDEA

Thick  precast panels created the typical precast challenge of building from the outside toward inside (outside-in) sequencing.  This meant continuity of water and air tightness coupled with sequencing was an opportunity for creativity.

architect:  GBD architects
occupancy date: 2008           CONSTRUCTION BUDGET:  $140 M

Image Credit: Josh Partee