REYNOLDS HIGH SCHOOL ARTS BUILDING
RHS ARTS BUILDING
With an extremely tight budget, this simple form with simple construction was designed to integrate the tall fly loft of the theater and provide acoustic isolation from each large teaching space and performance space.
architect: EEA architects
occupancy date: 2003 CONSTRUCTION BUDGET: $6 M